INSPECTION MANAGEMENT SYSTEM POLICY
INTEGRATED QUALITY CERTIFICATION PRIVATE LIMITED -INSPECTION DIVISION (IQCID) is committed to:
a) Develop and implement all applicable requirement of ISO/IEC 17020:2012(E) and ILAC-P15:05/2020 to provide inspection and expediting services impartially, independently and without any conflict of interest by utilizing competent resources.
b) Achieve objectives of inspection/expediting activities.
c) Focuses on safety requirements at the location where services are provided and enhance safety performance during provision of services.
d) Enhance service quality with focus on continual improvement and meeting the requirements of project specification.
Sl.No | PROJECT EXECUTED BY | VENDOR | PROJECT | SCOPE OF WORK/DESCRIPTION | INSPECTION LOCATION/ COUNTRY | YEAR/TYPE OF SERVICE |
1 | IQCID | Bhoruka Fabcons private Limited | Fire Safety Compliance / Human Safety Compliance Audit | Fire Safety Compliance / Human Safety Compliance Audit | India | 2023 |
2 | IQCID | Kumar Organic Products Limited | EHS Audit Service | Vedor Audit -Bangalore location | India | 2022 |
3 | IQCID | Kumar Organic Products Limited | EHS Audit Service | Vedor Audit -Hassan location | India | 2022 |
4 | IQCID | Kumar Organic Products Limited | EHS Audit Service | Vedor Audit -Vadodra location | India | 2022 |
5 | IQCID | Kumar Organic Products Limited | EHS Audit Service | Vedor Audit -Dahej location | India | 2022 |
6 | IQCID | Enegemasa Sao Paolo- Brazil | Expediting | As per the Inspection Assigment documents issued by Bureau Veritas and their client - L&T Hydrocarbon Engg | Brazil | 2022 |
7 | IQCID | Borsig Process Heat Exchanger GmbH Egellsstrasse 21, D - 13507 Berlin, Germany | Dual Feed Cracker Block Rajasthan Refinery Limited (HRRL-DFCU) - Package: EPCC-07 | SLE EXCHANGERS-125-E-1110 N(16.02.22) SLE EXCHANGERS-125-E-1110-M-(14.02.22) SLE EXCHANGERS-125-E-1110-L-(11.02.22) SLE EXCHANGERS-125-E-1110-K-(09.02.22) SLE EXCHANGERS-125-E-1110-G-(02.02.22) SLE EXCHANGERS-125-E-1110-F-(31.01.22) SLE EXCHANGERS-125-E-1110-E-(27.01.22) SLE EXCHANGERS-125-E-1110-C-(21.01.22) SLE EXCHANGERS-125-E-1110-B-(18.01.22) SLE EXCHANGERS-125-E-1110-A-(13.01.22) |
Germany | 2022 |
8 | IQCID | Five Cryo | Dual Feed Cracker Block Rajasthan Refinery Limited (HRRL-DFCU) - Package : EPCC-07 | (CORE EXCHANGER - COLD BOX) LP ETHYLENE PRODUCT COOLER (PO SR. NO. 5) Inspection Category- LTHE : B Inspection Category- EIL : C |
Germany | 2022 |
9 | IQCID | FIVES INDIA ENGINEERING AND PROJECTS PVT.LTD. 25 BIS RUE DU FORT, 88190 GOLBEY, | Dual Feed Cracker Block Rajasthan Refinery Limited (HRRL-DFCU) - Package: EPCC-07 | Exchanger 125-E-1361 Drum 125-V-1402 |
France | 2021 |
10 | IQCID | Steel forging FZC-Deharadun | Inspection of Flange | Flange,3 1/16”, API 6A, SCH.XXS, #10000 PSI, RTS, AISI 4130 Flange,2 1/16”, API 6A, SCH.XXS, #10000 PSI, RTS, AISI 4130 Flange,3 1/8”, 5K, SCH.XXS, RTS, AISI 4130 |
India | 2021 |
11 | IQCID | High Tech Detection Systems | SWGFD Insp. Call : SWGFD/NOI/6594 R0 for Laboratory Equipment-TNK (PO REFINERY/78000-15947/NDT) by High Tech Detection Systems. | Item: Laboratory Equipment-TNK Discipline: Instrumentation |
France | 2021 |
12 | IQCID | Arotec Inspection Partner GmbH & Co.KG Konrad-Zuse-Ring 1, 41179 Monchengladbach-Deutschland Mr Sohail Anbari / Mr Mohammed Falaki | Neumann &Esser Wurzen Deutschland Borsig Process Heat Exchangers Berlin Deutschland | Fees For Deputation of Approved Inspector at Neumann & Esser Wurzen and Borsig Berlin according to address as in NOI Overtime ( according to the time sheet & prior approval ) Approved Inspector for Borsig : Mr A Khadvi / Shahab Zamanzadegh Quantity mentioned are indicative which may increase or decrease | Germany | 2021 |
13 | IQCID | L&T Hydrocarbon Engineering Limited-Neuman & Esser Engineering India Pvt Ltd (India) Pvt. Ltd. | Dual Feed Cracker Block Rajasthan Refinery Limited (HRRL-DFCU) - Package: EPCC-07 | Dual Feed Cracker Block Inspection | Germany | 2021 |
14 | IQCID | L&T Talayan Tolian Heavy Industry & Technology, No 3 North Tianshan Road, Eco & Tech Development Zone Qinhuangdao, Hebei- 066004 | Bridge Gantry Crane-550T | EL704PO1000213 Bridge Gantry Crane-550T | China | 2021 |
15 | IQCID | Thermal Ceramics De France Sitek Wissembourg | CPCL, CHENNAI/CIRIA India | Inspection of Superwool Block 50 mm 3 palet, 108 pcs Superwool block 25 mm 10 boxes, 100 pcs | France | 2021 |
16 | IQCID | Jansen-Tore GmbH & Co. KG Am Wattberg 51, 26903 Surwold, Germany | Offshore Process Platform (CPP & LQUP) -Project for Development of KG-DWN-98/2 | Furniture, 1600x1000 & 800X1000, Fire Roller Shutter A60 Slim Line With Sus 304 Brushed Finish C/W Heavy Duty Sus 304 Accessories Welded Guide Rails And Gravity Closing. | Germany | 2021 |
17 | IQCID | High Tech Detection Systems/ Quantum Espace Technologique | South West Gas Fields Development Project | Inspection of Gas Treatment Unit (EPC 2 - Phase 1) | Germany | 2021 |
18 | IQCID | Rütgers Germany GmbH/RAIN Carbon GmbH | Third Party Audit | Pre Audit Work like check list, procedure etc/Mechanical Equipment , civil , etc /Piping , Insulation, Structures/E&I /Engg Doc/Change Order/Final Report -40Man days | Germany | 2021 |
19 | IQCID | Reliance Industries Limited - BV/Framo Flatøy ASFlatøyvegen 24 NO‐5918 Frekhaug, | Block KG-DWN 98/3 (KG D6)MJ Field Development | Sea water Lift Pump performance test (FAT) as per NOI SN2333‐NOI‐ME010‐017 on 16.02.2021 of Tag No 050‐PS‐001‐A (one no) | Norway | 2021 |
20 | IQCID | Rütgers Germany GmbH/RAIN Carbon GmbH | Third Party Audit | Pre Audit Work like check list, procedure etc/Mechanical Equipment , civil , etc /Piping , Insulation, Structures/E&I /Engg Doc/Change Order/Final Report -40Man days | Germany | 2021 |
21 | IQCID | ABB Helsinki | Sulzer Pumps India Ltd | Inspection of Motors | Finland | 2021 |
22 | IQCID | Rudeboksvagen 1 – Box 74 – SE-221 00 Lund Sweden/Alfa Laval Korea Ltd. | Inspection of Plate Frame Heat Exchanger | Condensate/SW Cooler A Condensate/SW Cooler B Produced Water Cooler |
Sweden | 2020 |
23 | IQCID | BERNARD CONTROLS S.A., RUE D'ARSONVAL 1, BP70091 95505 GONESSE | REPLACEMENT OF ELEVEN (11) BRRI PIPELINES | Inspection of 30-36" ON-OFF Actuated valves | France | 2020 |
24 | IQCID | ABB Helsinki | Sulzer Pumps India Ltd | Inspection of Motors | Finland | 2020 |
25 | IQCID | Reliance Industries Limited (TechnipFMC Paris)/NO‐5918 Frekhaug | Reliance Industries Limited (TechnipFMC Paris) MJ-1 RELIANCE | CVA - Witness as per approved ITPs IPR 21 - FO Cable FAT IPR 18 - 10mm² QUAD Electrical Cable FAT IPR 22 - 16mm² QUAD Electrical Cable FAT |
Norway | 2020 |
26 | IQCID | Benning Factory acceptance test FAT Nameplate check Visual inspection Alarm contactTesting Punch list | REPLACEMENT OF ELEVEN (11) BRRI PIPELINES | Inspection of Battery charger system Material | France | 2020 |
27 | IQCID | Baker Hugh | Inspecion in France | - | France | 2020 |
28 | IQCID | L&T HYDROCARBON ENGG LTD - BV/Karmsund Maritime Singapore Pte Ltd-Kopervik, | ONGC - NEW WATER INJECTION SOUTH - R PROJECT | OCTAGONAL (KAMOS) RTJ GASKETS SOFT IRON COATED WITH ZINC PLATING 18" CL 1500 R-71 ASME B16.20 | Norway | 2020 |
29 | IQCID | L&T - BV/Framo Fusa AS, Venjanesvegen 217, NO-5641 Fusa, | RIL- Block KG-DWN 98/3 (KG D6)MJ Field Development | FAT for 35 nos of pumps (Condensate Pumps, SD250 series 8 nos / Condensate Off-spec Pumps, SD250 - 2 nos / Slop Pumps, SD125 - 4 nos / Methanol Pumps, SD100 - 4 nos / Ballast Pumps, SB600 - 2 nos / Portable Pump TK150 - 1 no) witnessed as per ITP DOC-0120-0125-4 Rev A, performance test procedure Doc No: 0074-0434-4 REV A & SN2333-NOI-ME505-005-REV 01 | Norway | 2020 |
30 | IQCID | Sulzer Pumps India Pvt Ltd.-BV ABB Electrical Machines Ltd.,ABB Oy ,Motors and Generators ,Strömbergintie 1 B FI-00380 Helsinki, | Technicas Reunidas | Notification 1016005140- 10 for 12 motors comprising Type test and Routine test as per contract | Finland | 2020 |
31 | IQCID | L&T Hydrocarbon Engineering - BV LESER GmbH & Co. KG / FAINGER LESER VALVES (P) LTD, | ONGC - NEW WATER INJECTION SOUTH - R PROJECT | Inspection of PRESSURE SAFETY VALVE as per QAP 20443387_ITP for 2 days | Germany | 2020 |
32 | IQCID | Consortium of L&T Hydrocarbon Engineering Limited and EMAS AMC PTE LTD BENNING CONVERSION D'ENERGIE 43 AVENUE WINSTON CHURCHILL LOUVIERS CEDEX 27404 Overseas | Saudi Arabian Oil COMPANY (Saudi Aramco) & Aramco Overseas COMPANY B.V - Zulf 3SSS | Inspection of 24V DC POWER SUPPLY SYSTEM as per DCPBEN QM 310 ITP 1001 REV D Review of documents and Factory inspection - Witness on 25th and 26th August,2020 as per NOI 11BRRI/NOI/0593/IL#107000180379/2 R0 and for 2 hours on 18.12.2020 Inspector: Mr. Nadjari (QM 01) | France | 2020 |
33 | IQCID | Bureau Veritas | Reliance Industries limited - Samsung | Inspector: Michael B. Duldulao on 12th August,2020 for US 310-8 UTILITY SWIVEL ASSEMBLY Pressure Test as per NOI SN2333-TU001-064 (US310 test procedurePressure test (ITP ref. S-625) and on 19th August,2020 for FAT of US 310-8 Utility Swivel Assembly. Mr.Britto as per NOI SN2333‐NOI‐TU001‐073 for FAT ITM-0238589 PROCESS SWIVEL 1220-1 on 21.08.2020 and SN2333-NOI-TU001-073 Rev 1 for 26th August / SN2333-NOI-TU001-080 Rev 00 for 1st September for US 450-10 UTILITY SWIVEL ASSEMBLY pressure test and SN2333-NOI-TU001-083 Rev 00 for ITM-0245162 Swivel stack lower with SCC and HPU for System Integration Test (ITP activity S-651) on 7th September,2020 | Norway | 2020 |
34 | IQCID | L&T: Project | DHAKA MASS RAPID TRANSIT DEVELOPMENT PROJECT - MRT Line 6 - CONTRACT PACKAGE NO. CP-07 - Procurement of E&M System comprising of Track Works, Electrification System (Power Supply, Catenary, SCADA and Energy Storage System), Lifts and Escalators, Signalling System, Telecommunication System, Automatic Fare Collection System and Platform Screen Doors for MRT Line – 6. | TPI of Section Insulator Inspector - Mr.Ebrahim Feyzi Inspection on 30th,June,2020 as per document 07-OCS-MN00-ITP-00016 Rev no: 00A | France | 2020 |
35 | IQCID | Syn-ErgoMachines Pvt Ltd | Welding Procedure Qualifications according to ASME Sec IX as a total set of 18* Documents comprising 2 Material-Grades- Austenitic Stainless Steel: SA 351 Grade CF3M and Super-Duplex Stainless Steel SA-995 Grade 5A" to support the Welding-Repairs for Pressure-Valve Castings from 3 Indian Foundries | Review of WPS and PQR forAustenitic Stainless Steel: SA 351 Grade CF3M and Super-Duplex Stainless Steel SA-995 Grade 5A and approval by AWS - SCWI SCWI- Mr.Jerold Justine Jacob SCWI 17110 | Bengaluru,India | 2020 |
36 | IQCID | ACES Global Quality Services - FITECH - Abuhatim | Training on IMS Management System | QA-IMS Training Tutor: udaya Shankar Arakere | UAE-Oman | 2018 |
37 | IQCID | ACES Global Quality Services - FITECH | Development of IMS Management System documents for FITECH, Abu Dhabi, UAE | QA - Development of IMS Documents for FITECH Consultant: Udaya Shankar | Abudhabi,UAE | 2018 |
38 | IQCID | Muscat Overseas Oilfield Supplies Co. LLC | Various projects | TPE - Expediting of forgings at Techno forge /Lexcon Steels Limited Expeditor: Devang | Gujrat,India | 2018 |
39 | IQCID | Muscat Overseas Oilfield Supplies Co. LLC | Various projects | TPI - Inspection of forgings Inspector - Tejas Patel | Gujrat,India | 2018 |
40 | IQCID | Muscat Overseas Oilfield Supplies Co. LLC | Muscat Overseas Oilfield Supplies Co. LLC | TPI - Inspection of MCC Panel Inspector-S P Kulkarni | Pune,India | 2018 |